|
2023A& 2022A Perkins EST Electronic Service Tool Diagnostic Software Full Provide Installation Service
2. Install a new V-band clamp (2) onto turbocharger ( 1). Ensure that the V-band clamp is correctly
orientated.
3.
Install elbow connection (3) onto turbocharger (1). Loosely position
V-band clamp (2) onto the elbow connection and the turbocharger.
4.
Install the exhaust bellows. Refer to Disassembly and Assembly,
Flexible Exhaust Pipe - Remove and Install for the correct procedure.
5. Align elbow connection (3) with the exhaust bellows.
6. Tighten V-band clamp (2) to a torque of 8.5 N·m (75 lb in).
Lightly tap the V-band clamp with a soft faced
hammer to seat the V-band clamp. Refer to
Illustration
167 . Again,tighten the V-band clamp to a torque of 8.5 N·m (75 lb in).
Repeat this Step 6 until the V-band clamp are correctly seated onto the
turbocharger.
7
. If necessary, install the nitrogen oxide sensor to elbow connection
(3). Refer to Disassembly and Assembly, Nitrogen Oxide Sensor - Remove
and Install for the correct procedure.